Home › Resources › Templates › Audit plan template

Resources · Template

Audit plan template: what to include and how to fill it in

In shortAn audit plan is the document that sets out how one audit will be carried out: its objectives, scope, criteria, team, schedule, methods and reporting. This template lists the 14 fields an audit plan needs, with a filled example for each, following the guidance on audit planning in ISO 19011. Copy it straight from this page.

What is an audit plan?

An audit plan describes one audit. It tells the auditee what will be looked at, when, by whom and against what, and it tells the audit team how the work is divided. It is agreed before fieldwork starts.

It is not the same as an audit programme, which is the schedule of all the audits planned over a period, usually a year.

Covers a periodAudit programme

All audits planned for the year, why each was chosen, and the resources needed.

Covers one auditAudit plan

Objectives, scope, criteria, team, schedule and methods for a single audit. This template.

Covers one testTest script

The steps and samples for testing one control. See the control test script template.

Audit plan template

Fourteen fields. The middle column is an example you replace with your own.

Audit plan14 fields · example values shown
FieldExampleWhat to write
Audit title and referenceInternal audit of access management, IA-2026-07A unique reference, used on every working paper
Audit objectivesConfirm that access controls operate as designed and meet ISO 27001What the audit must conclude
ScopeHead office and cloud production; HR, IT operations; 1 Apr to 30 Sep 2026Locations, teams, processes and the period covered
Audit criteriaISO/IEC 27001:2022 clauses 5 to 10; Annex A 5.15 to 5.18; access control policy v3What you audit against
Audit team and rolesLead auditor, one auditor, one technical expertEach auditor independent of the work audited
Auditee contactsHead of IT operations; HR business partnerWho the team will meet
Dates, times and locationsOpening meeting 12 Oct, fieldwork 12 to 14 Oct, closing meeting 15 OctInclude remote sessions
MethodsInterviews, observation, document review, sampling of recordsHow evidence will be gathered
Sampling25 joiners, 25 leavers, one quarterly access reviewSample basis and size
Evidence requested in advanceUser lists, leaver report, last access reviewWith a due date
Logistics and resourcesSystem read access, meeting room, video linkWhat the team needs
ConfidentialityEvidence viewed in the audit workspace; no local copiesHow information is handled
ReportingDraft report 22 Oct; final report 29 Oct to the audit sponsorFormat, date and recipients
Follow-upCorrective actions agreed at closing; verified at the next auditHow findings are tracked
Ask for an editable file

The example values are illustrative. Copying pastes the table as rows and columns into a spreadsheet or document.

How do you fill in an audit plan?

  1. Start from the programme

    Take the objective and scope the audit programme gave this audit. Do not widen them without the sponsor's agreement.

  2. Fix the criteria

    List the exact standard, edition, clauses and internal documents. Findings can only be raised against criteria named here.

  3. Choose the team

    Check that each auditor is competent for the subject and independent of the work being audited.

  4. Agree dates with the auditee

    Send the draft plan early enough for people and evidence to be available, and confirm the opening and closing meetings.

  5. Decide methods and samples

    Say how evidence will be gathered and how samples will be chosen, so the result can be defended.

  6. Issue it, then keep it current

    Record who approved the plan. If it changes during the audit, note what changed and who agreed.

What makes an audit plan weak?

01

Criteria left vague

"Audit against ISO 27001" does not say which edition, clauses or internal policies apply.

Instead: name the edition, the clauses and each internal document.

02

No sampling basis

Samples picked on the day cannot be explained afterwards.

Instead: write the population, the sample size and how items are chosen.

03

Sent the day before

The auditee cannot prepare evidence or free the right people.

Instead: agree the plan well ahead of fieldwork.

Do you need a template at all?

Audit Workspace

In QULDEX the plan is part of the audit record: scope, criteria, team, schedule and evidence requests sit in one workspace, and the plan stays linked to the findings and the report.

See the workspace

Audit plan: common questions

What should an audit plan include?

Objectives, scope, criteria, the audit team and their roles, dates and locations, methods and sampling, the evidence requested in advance, logistics, confidentiality, reporting and follow-up.

What is the difference between an audit plan and an audit programme?

An audit programme schedules all the audits for a period. An audit plan describes how one of those audits will be carried out.

Who approves the audit plan?

The lead auditor prepares it and agrees it with the audit sponsor and the auditee before fieldwork begins.

Is this template free?

Yes. It is on this page, with no form to fill in. Copy it and adapt it to your organisation.

Plan the audit where you run it

Scope, criteria, team, evidence requests and findings in one workspace.

Schedule